Phase Change Materials (PCMs) can reduce the energy requirements of a building by reducing peak demand for either summer cooling or winter heating. PCMs also have the potential of reducing the amount of energy lost and increasing thermal comfort in buildings, by buffering temperature fluctuations. This research explores more efficient ways to host PCMs and further develop new methods of encapsulating PCMs and incorporating them into the built environment.
The following conclusions can be drawn from the results obtained thus far:
- Vacuum impregnation is a more effective method of absorbing the PCM into the lightweight aggregates (LWA) than immersion.
- The optimum impregnation ratio using a aerated concrete LWA and a temperature of 40°C is 1.3.
- The viscosity of the PCM influences the amount of PCM absorbed, although at lower temperature the effect is less significant.
- The time allowed for absorption influences the amount of PCM absorbed.
Find out more: https://www.bretrust.org.uk/phd/ahmad-wadee/
Contact: Ahmad Wadee, University of Bath, bath.ac.uk aw2060@bath.ac.uk.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.